Class of 1982 Engineering and Computer Science Center
The building provides a number of intimate settings for 1:1 or small-group meetings.
About the Project
In March 2022, Dartmouth completed construction of the 160,000 gsf Engineering and Computer Science Center (ECSC). In addition to housing faculty in these two academic disciplines, the ECSC is also home to the Magnuson Center for Entrepreneurship, the Dali Lab, and the Electron Microscope Facility. The expanded engineering and computer science programs in this building increase access to faculty through lower student-faculty ratios, expand opportunity for all students to integrate engineering and the liberal arts, and increase research and entrepreneurship opportunities.
Both the ECSC and Arthur L. Irving Institute for Energy and Society were considered as part of an integrated West End Master Plan which ensures that each building supports a strategic and sustainable vision for the entire West End. Enabling and improvement projects that support these new west end buildings include construction of a 340-space parking lot below the ECSC and extension of electrial and chilled/hot water utilities from the north to the west end of campus. The new building was funded wholly from philanthropy.
Designed and constructed as one of Dartmouth's top high-performance buildings, the ECSC will be considered for LEED platinum certification.
Video: First Day of Classes in the new Engineering and Computer Sciences Center
Project Milestone
- Construction: Winter 2020 - March 2022
Project Team
- Project Manager: Joe Broemel
- Architect: HGA
- Landscape Architect: Michael Van Valkenburgh Associates
- Construction Manager: Turner Construction
Related Links
- High-performance Building Features for the Engineering and Computer Science Center
- With Spring Term, Students Find New Spaces and Light, Dartmouth News, Mar., 2022
- Milestone for Center for Engineering & Computer Science, Dartmouth News, July, 2020
- Alexis Abramson Named Dean of Thayer School of Engineering, Dartmouth News, Apr., 2019
- Construction to Begin on West End Expansion at Start of New Year, Dartmouth News, Dec., 2018
- Town Seeks Permit Review of Thayer Expansion, Dartmouth News, Sept., 2018
- Integrating Engineering, Computer Science, Entrepreneurship, Dartmouth News, Mar., 2018
- $25 Million Gift Spurs Expansion of Dartmouth Engineering, Dartmouth News, May, 2016
- President Hanlon Announces Expansion of Engineering at Dartmouth, Dartmouth Engineer Magazine, Nov., 2013